Skip to main content
All CollectionsI'm an Event AdministratorThe Drawing
Add "Stop for the day" to your running order
Add "Stop for the day" to your running order
Updated over a year ago

This guide will walk you through the steps to add "Stop for the day" to your running order in PerfDog. This is helpful for events that span multiple days.

Watch this video or read step-by-step instructions below

1. Click "Unlock running order"

Unlock the running order by clicking on the "Unlock running order" button.

Click

2. Click "(add)"

Add a customization to the running order by clicking on the "(add)" link.

Click

3. Add a special item before or after brace 3

You can add a "break" or "stop for the day" before or after brace 3.

Add a special item before or after brace 3

4. Select "Stop for the day"

Select

5. Choose where you want to put it. Do you want it before or after the brace?

Choose where you want to put it. Do you want it before or after the brace?

6. Click inside the field to type in the restart time

Click inside the field to type in the restart time

7. Enter the desired time in the field

Enter the desired time in the field

8. Click "Save"

Save the changes by clicking on the "Save" button.

Click

9. The running order shows stopping after brace 3 and resuming on Sunday at 7:30 am

The running order shows stopping after brace 3 and resuming on Sunday at 7:30 am
Did this answer your question?